RP&A (relay protection and automation)
|
Automated System of Commercial Electricity Accounting
|
Control and technology management systems (SCADA)
|
Communication and telecommunications engineering
|
Electrical equipment design
|
- development of secondary connection schemes, functional and basic protection and automation schemes;
- design of automatic emergency systems;
- selection and configuration of relay protection devices, setting up of networks, coordination with the operators of power grids;
- implementation of digital RP&A-complexes on the basis of modern microprocessor terminals (Siemens, Schneider Electric, ABB, etc.).
|
- development of solutions for energy accounting in industrial and energy facilities;
- selection and placement of measurement devices (counters, current and voltage transformers);
- design of data collection, storage and communication systems architecture;
- integration with corporate accounting systems, ERP and SCADA;
- ccmpliance with the requirements of "KEGOC" and other operators.
|
- development of structural automation schemes, selection of equipment (PLC, servers, networks);
- design of SCADA-systems for operational management, control and analysis of process parameters;
- programming and configuration of human-machine interfaces (HMI), work logic, control algorithms;
- integration of SCADA with RP&A, automation of commercial electricity accounting systems, ERP and MES-systems.
|
- technology and corporate communication design (LСN, FOCL, radio, IP telephony, VPN);
- selection and placement of equipment: switchboards, routers, modems, radio stations, communication cabinets;
- organization of secure data transfer between facilities and control points;
- design of time synchronization systems (GPS/GLONASS) and telemetry transmission.
|
- development of projects of power equipment: PTS, switchyard, power center, etc;
- electrical schematics of primary connections, calculation of loads, short-circuit currents, selection of equipment and cable routes;
- design of power supply systems up to 35kV;
- ensuring that the project documentation of wiring regulation, GOST and other regulatory requirements are met.
|