Year 2025

 

Year Project The first customer Counterparty
2025 Construction of high-voltage lines and substations for residential areas in Taraz. Kumshagal substation, Sholdala substation, Aisha-Bibi substation "Department of Energy and Housing and Communal Services of Akimat of Zhambyl region" "Nur-Altai" LLP
2025 Construction of wind farm facilities at Atyrau NPP. Overhead 220 kV, substation 220/10kV "CASPIAN PIPELINE CONSORTIUM - K" JSC "ASPMK-519 " LLC
2025 Expansion of the existing 10 kV complete switchgear, Astana (DMV-A 25 kA 1250A 10 kV input cabinet) "People's Savings Bank of Kazakhstan" JSC "Legally Trade" LLC
2025 Reconstruction of a 6 kV switchgear, control panels, measurements and cable connections at substation No. 1 of the K. Satpayev Canal branch in the Pavlodar region of the Karaganda region (substation No. 1 of a block modular building of 5 modules + 6 MW; substation No. 1 - 6 MW) "Kanysh Satpayev Canal Branch of the Republican State Enterprise at the Kazvodkhoz Nuclear Power Plant" "Promstroy-Energo" LLP
2025 Construction of a double-chain 110 kV transmission line with 110/10 kV substation for sections 6.7 of the Budenovskoye field in the Sozak district, Turkestan region LLP JV "Budenovskoye" "EIS Corporation" LLC
2025 Acidification Process Unit standard “KATCO” JV  LLP “KATCO” JV  LLP
2025 Construction of a plant for the production of salty snacks by "Pepsi Co Central Asia" LLP, Almaty region, Ili district, Bayserki rural district, near the village of Yntymak LLP "PepsiCo Central Asia" "Electroservice "LLP
2025 Reconstruction of 110/35/10 kV substation No. 46A Shosseynaya with replacement of transformers with 2x63 MVA with a 10 kV power supply JSC "Alatau Lighting Engineering Company" "Promstroy-Energo" LLP
2025 Reconstruction of complete switchgears -6 kV, control panels, measurements and cable connections to pumping station No. 2 of the K. Satpayev Canal branch, Pavlodar region, Karaganda region (HC No. 2 block-modular buildings of 3 modules + 6 MVC) "Kanysh Satpayev Canal Branch of the Republican State Enterprise Kazvodkhoz" "Electroservice "LLP
2025 Modernization of "Tekeli Energy Complex" LLP with the construction of a combined cycle gas plant. The GAC generator switch. "Tekeli Energy Complex" LLP "Tekeli Energy Complex" LLP
2025 Design of the working documentation for the project: "Hybrid power plant in Zhanaozen" Branch of "Mangystau Power B.V." "Kazakhstan Caspian Offshore Industries" LLP
2025 Reconstruction of the 110 kV open switchgear of JSC "TMK Management Company" "Ust-Kamenogorsk Titanium and Magnesium Combine" JSC "Optiktelecom Stroyservice" LLP
2025 External power supply to the "MPI" ferroalloy plant. Reconstruction of the existing 220 kV Outdoor Switchgear of Ekibastuzskaya GRES-1 within the framework of existing design capacities and technologies "Mineral Product International" LLC "Electroservice "LLP
2025 Construction of high-voltage lines and substations for residential areas in Taraz. PS Koltogan. "Department of Energy and Housing and Communal Services of the Akimat of Zhambyl region" "ASPMK-519 " LLC
2025 Reconstruction of 220/35/10 kV Shieli substation in Shieli village, Kyzylorda region (DC cabinet and Self-Catering Cabinet) "Kyzylorda Electric Grid Distribution Company" JSC "ASPMK-519 " LLC
2025 Construction of a 110 kV overhead line from an Open Switchgear -110 kV of the 182 Beskol Substation to the Akshi Substation with the construction of a new 110/35/10 kV Akshi substation and reconstruction of the 110/35/10 kV Beskol Substation (Akshi Substation) with 26 cells, Relay Protection and Automation cabinets State Administration "Department of Housing and Communal Services, Passenger transport, highways and Housing Inspection of the Alakolsky district" "ASPMK-519 " LLC
2025 Reconstruction of a Closed Switchgear -10 kV and an Open Switchgear-220 kV with the replacement of 220 kV switches with 220 kV Aktobe substation "КЕGОC" JSC "ASPMK-519 " LLC
2025 Construction of HPP-2 on the Kora River (Relay Protection and Automation cabinets, Voltage transformer circuit distribution cabinet, SCADA, ASCME and communication systems) "Energiya Zhetysu" LLP "KaratalTransit" LLP
2025 Construction of the engineering and transport infrastructure of the Taraz industrial zone of republican significance in the city of Taraz, Zhambyl region" 1st stage with an authorized capacity of 10 MW and 2nd stage with an installed capacity of 45 MW. The scheme of external power supply to the Industrial zone of Taraz. 2nd turn. "Taraz" Industrial Zone Management Company" LLP "ASPMK-519 " LLC
2025 Modernization and reconstruction of substations of Main networks: Substation "Paulgan" 220 kV, substation "Traktorsoz 220 kV", substation "Guzal 220 kV". "NATIONAL ELECTRIC NETWORKS OF UZBEKISTAN" JSC "ASPMK-519 " LLC
2025 "169 Cement Plant" Substation "KaratalTransit" LLP "KaratalTransit" LLP
2025 Reconstruction of 220/35/10 kV Shieli substation in Shieli village (Distribution cabinet of VT circuits ШНУ-1-63-73) , Kyzylorda region  "Kyzylorda Electric Grid Distribution Company" JSC "ASPMK-519 " LLC
2025 The cabinet of the Internal Switchgear for the office of "ASPMK-519" LLP "ASPMK-519 " LLC "ASPMK-519 " LLC

Year 2024

 

Year Project The first customer Counterparty
2024 Construction of a 110 kV overhead line from the 110 kV switchyard of substation 182 in "Beskol" to the "Akshi" substation, including the construction of a new 110/35/10 kV substation in "Akshi" and the reconstruction of the "Beskol" substation to 110/35/10 kV ("Beskol" substation) State Institution “Department of Housing and Utilities, Passenger Transport, Motorways, and Housing Inspection of the Alakol District” "ASPMK-519" LLP
2024 Reconstruction of the 220/35/10 kV Shieli substation in the village of Shieli, Kyzylorda region (modular buildings consisting of 7 modules, voltage transformer circuit distribution cabinets, DC distribution panel, and auxiliary service panel) "Kyzylorda Distribution Grid Company" JSC "ASPMK-519" LLP
2024 Expansion of Distribution Substation No. 4, 1 cell for power supply to the 4-story administrative building of "Energia Zhetysu" LLP "ATP-Energosstroy" LLP "ATP-Energosstroy" LLP
2024 Oil pumping station (OPS) “Atyrau” JSC "CASPIAN PIPELINE CONSORTIUM - K" "ASPMK-519" LLP
2024 Auxiliary service panel 0.4 kV TK "Metakon" LLP TK "Metakon" LLP
2024 Construction of high-voltage lines and substations for residential areas in Taraz. Koltogan substation. State Agency “Energy and Housing and Utilities Management of the Zhambyl Region Akimat” "ASPMK-519" LLP
2024 Reconstruction of 110/35/10 kV substation No. 39 “Dostyk” (19 switchgear units + cabinets) JSC NK “Kazakhstan Temir Zholy” "ASPMK-519" LLP
2024 Reconstruction of the 35/10 kV "Dostyk Novaya" substation (modular buildings + 10 switchgear units + cabinets) JSC NK “Kazakhstan Temir Zholy” "ASPMK-519" LLP
2024 ASCME cabinet LLP "Kyzyl Aray Copper" "ASPMK-519" LLP
2024 Reconstruction of 110/35/10 kV substation No. 39 “Dostyk” JSC NK “Kazakhstan Temir Zholy” "ASPMK-519" LLP
2024 Turnkey construction of a 110/10 kV substation and a single-circuit 110 kV overhead line under the project: "External power supply for the Benkalinskoe field. Aitekebiy district, Aktobe region (substation for the Zhailm substation). "Benkala Mining Company" JSC "ASPMK-519" LLP
2024 Reconstruction of the Kairaky substation SIPROTEC - 6 units + Test switch - 14 units + 7PA high-speed relay - 66 units (4 new relay protection and automation cabinets, 5 new switchgear cabinets, and modification of 3 existing relay protection and automation cabinets) "Kyzyl Aray Copper" LLP "ASPMK-519" LLP
2024 SCADA, ASCME, Communications "Sary-Arka Copper Processing" LLP "ASPMK-519" LLP
2024 Design and construction of a new external power supply for the 220/10 kV substation of the "Tengiz" oil pumping station as part of the bottleneck elimination program (18 modular buildings with HVAC systems, distribution cabinet of VT circuits, relay protection and automation panels, as well as ASCME, communication cabinet, SCADA, protection cabinet of transformer, auxiliary service panel, and DC distribution panel) "Caspian Pipeline Consortium - K" Joint Stock Company "ASPMK-519" LLP
2024 TKDi intermediate platform. Pumping station with transformer substation “KATCO” JV  LLP "IC KazTurboRemont" LLP
2024 TKDi intermediate platform. Pumping station with complete transformer substation (3 power boxes). “KATCO” JV  LLP "IC KazTurboRemont" LLP
2024 Construction of a processing complex (Complete Transformer Substation 17A, Complete Transformer Substation 17B, and Complete Transformer Substation 17V) “KATCO” JV  LLP “KATCO” JV  LLP
2024 Kaspi Cloud Data Center (Power Supply and Lighting, Kaspi Data Center) LLP "KASPI CLOUD" LPP "KASPI CLOUD" 
2024 SCADA lower level 6-10 kV at the facilities of "Karagandy Zaryk" LLP (Special No. 1, No. 2, No. 3) "Karagandy Zaryk" LLP PSF "PROFI" LLP
2024 Main 10.5 kV energy distribution node of "Tekeli Energy Complex" LLP "Tekeli Energy Complex"LLP "Tekeli Energy Complex"LLP
2024 A lubricant production plant with a capacity of 100,000 tons per year in Almaty, PS 35/10kV “Zavodskaya.” Additional switchgear cell for SES 4.96 MW. "LUKOIL Lubricants Central Asia" LLP "Engineering Procurement Services Kazakhstan" LLP
2024 Construction of power supply networks for the “Shift Camp” and “Construction Site” (NXAIR_S - 2 units) "EuroChem Mineral and Chemical Company" JSC "OMAR SHERKHAN STROY" LLP
2024 Construction of a seawater desalination plant at the following location: Mangistau Region, Tokymak area "Mangistauenergomunai"LLP "Promstroy-Energo" LLP
2024 Construction of high-voltage lines and substations for residential areas in Taraz. Kumsaghal substation, Sholdala substation, Aisha-Bibi substation State Agency “Energy and Housing and Utilities Management of the Zhambyl Region Akimat” "Nur-Altai" LLP
2024 Reconstruction of 6 kV switchgear, control panels, measurement and cable connections at substations No. 8 and 14 of the K. Satpayev Canal branch in Pavlodar and Karaganda regions (Pumping station No. 8 of the modular building - a modular building consisting of 5 modules + 5 MVC; Pumping station No. 8 - 5 MVC; Pumping station No. 14 of the modular building - modular building consisting of 5 modules + 5 MVC; Pumping station No. 14 - 5 MVC) Branch “Kanyash Satpayev Canal” of the Republican State Enterprise “Kazvodkhoz” "Promstroy-Energo" LLP
2024 Modernization of the fire extinguishing system at the Ammonium Nitrate Warehouse at Site No. 1 “Yuzhny” of the Moinkum deposit and Site No. 2 “Tortkuduk” “KATCO” JV  LLP "OrdaPerspektivStroy" LLP
2024 Comprehensive turnkey construction work on the project: "Construction of a power plant based on a 1000 MW steam-gas turbine unit in the Turkestan region. Power supply from the power system to the 500 kV Shymkent substation at voltages of 500 and 220kV. PGU “Turkestan” LLP "Energy RK" LLP
2024 Special automatic load limitation cabinets - 2 pcs. and cable products "Tekeli Energy Complex"LLP "Tekeli Energy Complex"LLP
2024 12 units of 630 kVA transformer substations for "KATKO" LLP “KATCO” JV  LLP LLP SP “KATKO”
2024 Construction of a power plant based on a combined cycle gas turbine with a flexible generation mode and a total capacity of up to 1000 MW in the Turkestan region. (Monitoring system cabinet) PGU “Turkestan” LLP "WikiNet" LLP
2024 Construction of power generation facilities under the project “Construction of HPP-1.1 on the Koktal River in the Kerbulak District, Almaty Region” National Energy Company “Zharik Energo” LLP "SanEpidemService" LLP
2024 A lubricant production plant with a capacity of 100,000 tons per year in Almaty, PS 35/10kV “Zavodskaya.” Additional switchgear cell for SES 4.96 MW. "LUKOIL Lubricants Central Asia" LLP "LUKOIL-Ecoenergo Kazakhstan" LLP
2024 Reconstruction of the 220/35/10 kV Shieli substation in the village of Shieli, Kyzylorda region (36 NXAirs cells + 16 relay protection and automation cabinets) KSU “Kyzylorda City Department of Housing and Utilities, Passenger Transport, and Motorways” of the Kyzylorda City Administration "Energo onim" LLP
2024 Main distribution node 10.5 kV "Tekeli Energy Complex" LLP (DC distribution panel, 4 units) "Tekeli Energy Complex"LLP "Tekeli Energy Complex"LLP
2024 Modernization, implementation of a control and management system, electrical network system with the purchase of equipment, telemechanics system for the 35/10 kV Ortalyq substation with connection to the existing SCADA system and organization of communication channels for the 35/10 kV Ortalyq substation. "Kyzylorda Distribution Grid Company" JSC "Kyzylorda Distribution Grid Company" JSC
2024 Expansion of the existing 10 kV switchgear, Halyk Bank, Astana (DMV-A 25 kA 1250A 10 kV input cabinet) "Halyk Savings Bank of Kazakhstan" JSC "Zandy Sauda" LLP
2024 Creation of ASCME at Substation 220/35/6 kV Cement Plant "Zhambyl Cement Production Company" LLP "Zhambyl Cement Production Company" LLP
2024 Construction of the LLP SP “KATKO” processing complex “KATCO” JV  LLP South Kazakhstan Branch of JSC “NGSK KazStroyService”
2024 Reconstruction of the 6 kV switchgear, control panels, measurement equipment, and cable connections at Pumping Station No. 1 of the K. Satpayev Canal branch in Pavlodar Region, Karaganda Region (Pumping Station No. 1 Block-modular building - Block-modular building consisting of 5 modules + 5 MVC-W-10; Pumping Station No. 8 - 5 MVC-W-10) Branch “Kanyash Satpayev Canal” of the Republican State Enterprise on the Right of Economic Management “Kazvodkhoz” "Promstroy-Energo" LLP

Year 2023

 

Year Project The first customer Counterparty
2023 Construction and use of a mobile uranium concentration plant (uranium concentrator plant No. 1) for Tortkuduk North Unit No. 20 “KATCO” JV  LLP “KATCO” JV  LLP
2023 “Pilot industrial trials on the use of hydrogen peroxide as an oxidizing agent in underground uranium leaching at the mines of SP KATKO LLP. Phase 3: Industrial trials. Stage: development of design documentation and manufacture of the installation.” “KATCO” JV  LLP “KATCO” JV  LLP
2023 Construction and use of a mobile uranium concentration plant (uranium concentrator plants No. 2 and No. 3) for Tortkuduk North Unit No. 01 and No. 04 “KATCO” JV  LLP “KATCO” JV  LLP
2023 Construction of a multi-story business center with underground parking, north of Al-Farabi, west of the Esentai River, Bostandyk District, Almaty (0.4 kV distribution cabinets = 142 units). Developer - "Atlas Development" LLP 
General contractor: JSC “NGSK Kazstroyservice”
"Matte construction" LLP 
2023  Network equipment cabinet (NEC)№1, Network equipment cabinet (NEC)№2 "Sinergetika" LLC "Sinergetika" LLC
2023 Construction of a 50 MW wind farm at "Dzungarian Gate" "SUNGROW Qurylys" LLP  "SUNGROW Qurylys" LLP 
2023 Complete transformer substations, 630 kVA, 16 units. “KATCO” JV  LLP “KATCO” JV  LLP
2023 Block-modular building consisting of three modules for alarm, centralization, and interlocking equipment "Bogatyr Komir" LLP "LocoTech-Signal Asia" LLP
2023 Reconstruction of the main building No. 2 of the Zhezkazgan enrichment plants No. 1, 2, and 3 with a capacity of 14 million tons "Kazakhmys Corporation" LLP "NOVOMEK KAZAKHSTAN" LLP
2023 SCADA training panel "KEGOC" Co., Ltd. "KEGOC" Co., Ltd.
2023 TKDi intermediate platform. Pumping station with complete transformer substation “KATCO” JV  LLP "SK KazTurboRemont" LLP
2023 SM-6 switchgear cells - GAM  2 pcs. "SISTEM ELECTRIC ZEM" LLC "SISTEM ELECTRIC ZEM" LLC
2023 Kaspi Cloud Data Center (Transformer Substation 1 and Transformer Substation 2 of the modular type Complete Transformer Substation -1x4000-10/0.4) LLP "KASPI CLOUD" LLP "KASPI CLOUD"
2023 "SOGAZ" Clinic Transformer Substation -2 (switchgear SM-6 - DMV-A cells) 2 pcs. "SISTEM ELECTRIC ZEM" LLC "SISTEM ELECTRIC ZEM" LLC
2023 Distribution board Optima "Tengizchevroil" LLP "NAO-Energy" LLP 
2023 110 kV Sarkand HPP substation (110 kV line protection cabinet with two REL-670 terminals) "Zandy Saud" LLP "Zandy Saud" LLP
2023 TKDi intermediate platform. Pumping station with complete transformer substation. “KATCO” JV  LLP "SK KazTurboRemont" LLP
2023 Reconstruction of the main building No. 2 of the Zhezkazgan enrichment plants No. 1, 2, and 3 with a capacity of 14 million tons "Kazakhmys Corporation" LLP "NOVOMEK KAZAKHSTAN" LLP
2023 Reconstruction of the 35/6 kV Shatyrkul substation Relay protection and automation cabinets "Kazakhmys Corporation" LLP "MontageTechProm" LLP
2023 Reconstruction of 110-220 kV cells with replacement of 110/220 kV oil circuit breakers, 110/220 kV TT, and 110/220 kV disconnectors at the 220 kV Balkhashskaya substation in the Central Main Power Grids branch. "KEGOC" Co., Ltd. "Karektrospetsstroy" LLP
2023 Modernization of the ammonia water storage facility at site No. 2 of the Tortkuduk field in the Moinkum deposit in the "Suzak" district of the Turkestan region (Communication Shield and Control Panels) “KATCO” JV  LLP "OrdaPerspektivStroy" LLP
2023 TKDi intermediate platform. Pumping leaching station with complete transformer substation (3 power boxes). “KATCO” JV  LLP "SK KazTurboRemont" LLP
2023 “Strengthening the electrical network of the Western Zone of the Unified Electric Power System of Kazakhstan. Construction of electrical network facilities. Construction of the 220 kV Karabatan Distribution Substation” (Distribution board Optima VX25) "KEGOC" Co., Ltd. "Energy RK" LLP
2023 Construction of a processing complex in the southern part of the deposits of plot No. 2 of the Tortkuduk field of the Moinkum deposit (Complete transformer substations 17A, Complete transformer substations 17B, and Complete transformer substations 17V) “KATCO” JV  LLP LLP SP “KATKO”
2023 External power supply for the southern deposits of Section No. 2 “Tortkuduk” of the
Moinkum field (start-up complexes 1-5) (18 modular buildings and 24 GMA units)
“KATCO” JV  LLP "ASPMK-519" LLP
2023 Block-modular buildings with 18 modules + Block-modular buildings with 4 modules + NEX-13 units. “KATCO” JV  LLP "ASPMK-519" LLP
2023 Strengthening of the electrical network in the western zone of Kazakhstan's Unified Energy System. Construction of electrical network facilities. Expansion of 220 kV open switchgear with the installation of two 220 kV controlled shunt reactors at the 220 kV "Inder" substation (32 disconnectors). "KEGOC" Co., Ltd. "ASPMK-519" LLP
2023 220 kV Inder substation (ASCME, communication cabinet) "KEGOC" Co., Ltd. "ASPMK-519" LLP
2023 Design, material and technical responsibility, and construction of a new external power supply for the 220/10 kV Tengiz oil pumping station as part of the bottleneck elimination program (18 modular buildings and a 10 kV switchgear cell 1600A). "Caspian Pipeline Consortium - K" Joint Stock Company "ASPMK-519" LLP
2023 Tengiz Oil Pumping Station (Temporary Buildings and Structures) Domestic buildings "ASPMK-519" LLP "ASPMK-519" LLP
2023 Reconstruction of the 220/110/10 kV "Sholakorgan" substation of the Southern Main Power Grids branch of "KEGOC" JSC "KEGOC" Co., Ltd. "ASPMK-519" LLP
2023 Design, material and technical responsibility, and construction of a new external power supply for the 220/10 kV Tengiz Oil Pumping Station as part of the Bottleneck Elimination Program in the Atyrau region, Republic of Kazakhstan (20 disconnectors) (temporary 10 kV cell + meter) (Auxiliary service panel and DC distribution panel) "Caspian Pipeline Consortium - K" Joint Stock Company "ASPMK-519" LLP
2023 Construction of the Almaly-2 mining and processing complex using heap leaching technology for secondary ores with a capacity of up to 30,000 tons of cathode copper per year in the Shet district of the Karaganda region (MVC-W, modular buildings, auxiliary service panel, DC distribution panel, etc.) "Sary-Arka Copper Processing" LLP "ASPMK-519" LLP
2023 Construction of HPP-3 on the Kora River (AC distribution panel - 2 pcs.)
"ASPMK-519" LLP "ASPMK-519" LLP
2023 Turnkey construction of a 110/10 kV substation and a single-circuit 110 kV overhead line according to the project: “External power supply for the Benkalinskoye field.” Aitekeibiy District, Aktobe Region (Block Modular Building, MVC-W switchgear - 8 units). "Benkala Mining Company" JSC "ASPMK-519" LLP
2023 SCADA, ASCME, Communications "Sary-Arka Copper Processing" LLP "ASPMK-519" LLP
2023 Special Load Disconnection Automation Cabinet - 1 pc. "Sary-Arka Copper Processing" LLP "ASPMK-519" LLP
2023 Construction of HPP-3 on the Kora River (Communication cabinets) "ASPMK-519" LLP "ASPMK-519" LLP
2023 Reconstruction of the Kairaky substation SIPROTEC - 6 units + Test switch - 14 units + 7PA high-speed relay - 66 units (4 new relay protection and automation cabinets, 5 new distribution cabinets for VT circuits, and modification of 3 existing relay protection and automation cabinets) "Sary-Arka Copper Processing" LLP "ASPMK-519" LLP
2023 Construction of additional high-voltage cells from the 110/35/6 kV Beyneu substation (2 cells with KAZNEX vacuum circuit breakers, Chief Installation Works)
"Benkala Mining Company" JSC "ASPMK-519" LLP

Year 2022

 

Year Project The first customer Counterparty
2022 Construction and use of a mobile concentration plant (concentrator plant No. 1) for Tortkuduk North Unit No. 20 “KATCO” JV  LLP “KATCO” JV  LLP
2022 "Pilot testing at the mines of “KATCO” JV  LLP. Phase 3: Industrial testing. Phase: development of design documentation and manufacturing of the unit “KATCO” JV  LLP “KATCO” JV  LLP
2022 Construction and utilization of mobile concentrating unit (concentrator unit №2 and №3) for Tortkuduk North Unit №1 and №4 “KATCO” JV  LLP “KATCO” JV  LLP
2022 Construction of additional high-voltage cells from Beineu 110/35/6 kV substation (2 cells with KAZNEX vacuum circuit breaker, installation supervision)
State institution “Beineu district department of housing and communal services, passenger transportation and highways” "AYCOM" Ltd.
2022 Reconstruction of pitch storage on the territory of the Electrode Shop of "TMP" LLP, Taraz city. "Taraz Metallurgical Plant" LLP "Alinur Saulet" LLP
2022 Construction of 220 kV overhead line and 220 kV substation for power supply of primary ore processing complex (2 KAZNEX switchgears) expansion "RG Processing" LLP "RG Processing" LLP
2022 Construction of 220 kV overhead line and 220 kV substation for power supply to the primary ore processing complex (BMB and 14 KAZNEX switchgears) for the Gold Recovery Plant. "RG Processing" LLP "RG Processing" LLP
2022 Modernization of 2 switchgear for 1250A "RG Processing" LLP "RG Processing" LLP
2022 Substation 220/35 kV “Ereimentau Wind Power Plant” (SCADA cabinet and automated workplace) JSC "KEMONT" JSC "KEMONT"
2022 110 kV switchgear of 110 kV Kentau 220 kV substation in the Southern MES branch of KEGOC (Distribution cabinet of VT circuits of 110 kV VT) "KEGOC" Co., Ltd. "Saryarqa-MS" LLP
2022 35kV power supply of Tuzkol field (SCADA, Communications, ASCME cabinet) "PetroKazakhstan Kumkol Resources" JSC "ABK Construction Group" LLP
2022 ArnauAgro fruit storage facility (0.4 kV switchgear cabinets) "Advice and Consulting" LLP "Advice and Consulting" LLP
2022 Reconstruction of 220/110/10 kV Kulsary substation (10 kV sectionalizer RPA cabinet) "KEGOC" Co., Ltd. ТОО "Saryarqa-MS"
2022 Cupboard OPTIMA 2000+200*800*600 (front door-glass:rear door-double) LLC “Syenergetika” LLC “Syenergetika”
2022 Construction of multi-storey business center with underground parking, north of Al-Farabi, west of Esentai river, Bostandyk district" Almaty city (Distribution cabinets 0,4kV 143pcs). Developer - "Atlas Development" LLP 
General contractor: JSC “NGSK Kazstroyservice”
"Matte construction" LLP 
2022 Borey substation (Distribution cabinet of VT circuits) "SUNGROW Qurylys" LLP  "SUNGROW Qurylys" LLP 
2022 Metal construction Cupboard Optima 1800x600x800 "AVECom" LLP  "AVECom" LLP 
2022 Network equipment cabinet (NEC) LLC “Syenergetika” LLC “Syenergetika”
2022 Construction of 50 MW "Dzungarian Gate Wind Power Plant" "SUNGROW Qurylys" LLP "SUNGROW Qurylys" LLP
2022 Reconstruction of 110-220 kV cells with replacement of 110/220 kV oil circuit breakers, 110/220 kV CTs and 110/220 kV disconnectors at the Balkhashskaya 220 kV substation at the Central Trunk Power Grids branch of the Company. "KEGOC" Co., Ltd. "Karelektrospetsstroy" LLP
2022 Complete transformer substations 630 kVA in quantity of 16 pcs. for SP KATKO LLP. “KATCO” JV  LLP “KATCO” JV  LLP
2022 Cabinets for transmitting alarms and commands "WES 50MW Abay 2" LLP "WES 50MW Abay 2" LLP
2022 BMB of three modules for signalling equipment "Bogatyr Komir" LLP "LocoTech-Signal Asia" LLP
2022 Revamping of main building No. 2 of Zhezkazgan concentrators No. 1,2,3 at a capacity of 14 million tons "Kazakhmys Corporation" LLP "NEWEK KAZAKHSTAN" LLP
2022 SCADA training panel "KEGOC" Co., Ltd. "KEGOC" Co., Ltd.
2022 Intermediate site TKDi. Pumping leaching station with complete transformer substation “KATCO” JV  LLP SK “KazTurboRemont” LLP
2022 External power supply of Southern deposits of Tortkuduk Section No.2 of Moinkum field (start-up complexes 1-5) (start-up complexes 1-5) (BMB 18 modules and GMA-24 pcs. + BMB 4 modules and NEX-13 pcs.). “KATCO” JV  LLP "ASPMK-519" LLP
2022 (BMB 18 modules + BMB 4 modules+NEX-13 pcs. etc.)
2022 Strengthening of the power grid of the Western Zone Unified Electric Power System of Kazakhstan. Construction of power grid facilities. Expansion Open switchgear 220 kV with installation of 2 USHR-220 kV PS 220 kV “Inder” (RPA cabinets) "KEGOC" Co., Ltd. "ASPMK-519" LLP
2022 "Strengthening of the electric grid of the Western zone Unified Electric Power System of Kazakhstan. Construction of power grid facilities. Reconstruction of 220 kV Uralskaya substation (Communication) "KEGOC" Co., Ltd. "ASPMK-519" LLP
2022 Strengthening of the power grid of the Western Zone Unified Electric Power System of Kazakhstan. Construction of power grid facilities. Expansion of 220 kV Open Switchgear with installation of 2 controlled shunt reactor-220 kV PS 220 kV “Inder” (Disconnectors - 20 pcs.). "KEGOC" Co., Ltd. "ASPMK-519" LLP
2022 Expansion Open Switchgear -220 PS Inder (Complete Low Voltage Switchgear 2 pcs.) + DC-2 cabinets in the amount of 2 pcs. "KEGOC" Co., Ltd. "ASPMK-519" LLP
2022 Expansion Open switchgear -220 PS Inder (Auxiliary service panel 2 pcs. + LDC 2 pcs.). "KEGOC" Co., Ltd. "ASPMK-519" LLP
2022 220 kV Inder substation (ASCME ) "KEGOC" Co., Ltd. "ASPMK-519" LLP
2022 Strengthening of the power grid of the Western Zone Unified Electric Power System of Kazakhstan. Construction of power grid facilities. Construction of 220 kV single-circuit overhead line 220 kV Substation 220 kV Inder - Distribution Substation 220 kV Karabatan" in Atyrau region "KEGOC" Co., Ltd. "ASPMK-519" LLP
2022 Complete Transformer Substation 25-10/0.4 kV for Maintenance-free Regeneration Station "KEGOC" Co., Ltd. "ASPMK-519" LLP
2022 Tengiz Oil Pumping Station (Temporary Buildings and Structures) (Household Buildings) "ASPMK-519" LLP "ASPMK-519" LLP
2022 External power supply scheme of the Shatyrkul field "Kazakhmys Corporation" LLP "ASPMK-519" LLP
2022 Video surveillance for “Temirbeton" LLP "Temirbeton" LLP "Temirbeton" LLP
2022 110/10kV Yuzhnaya-2 substation (ASCEQ (Automated System Control of Electricity Quality) and HF communication) State Institution “Department of Housing and Utilities of Temirtau city” "ASPMK-519" LLP
2022 Construction of HPP-3 on the Kora River (Distribution cabinet of VT circuits, RPA cabinets, SCADA cabinets, ASCME) "ASPMK-519" LLP "ASPMK-519" LLP
2022 CHARGER 60 KW DC electric vehicle charger - 1 pc. "SmartT" LLP "SmartT" LLP 

Year 2021

 

Year Project The first customer Counterparty
2021 Distribution cabinet of VT circuits for Tengiz "Tengizchevroil" LLP "StroyEnergoService-K" LLP
2021 Installation of 220 kV voltage transformer at the 220/20 kV substation “Solar Electric Station Baikonyr” "Caspian Legacy Construction" LLP "ASPMK-519" LLP
2021 Construction of Production Base in Taldykorgan Substation No. 149, Substation No. 152; "KEGOC" Co., Ltd. ТОО "КазНефтеГазПромСтройСервис"
2021 Modernization of the power grid system of Kyzylorda oblast JSC "KREK" "ASPMK-519" LLP
2021 KAZNEX switchgear 19 pcs. "PKKR" JSC "PKKR" JSC
2021 assembly of overhead line-220kV, Balkhash substation "KAZ GREEN ENERGY" LLP "ASPMK-519" LLP
2021 48 MW wind farm near Badamsha village "Arm Wind" LLP "KAZPACO" LLP
2021 Complete Transformer Substations 630 kVA 10/0,4 kV in the amount of 15 pcs. LLP "SP KATKO” LLP "SP KATKO”
2021 Strengthening of external power supply of Turkestan city (Communication and ASCME) "KEGOC" Co., Ltd. "ASPMK-519" LLP
2021 Underground Mine JSC "Altyntau Kokshetau" ("Vasilkovsky" GOK) Dispatch Center (SCADA) АО "Altyntau Kokshetau" "ASPMK-519" LLP
2021 Main switchgear -0.4 kV and transformer 1250 kVA "GenAir" LLP "GenAir" LLP
2021 Distribution cabinet of VT circuits for “48 MW Badamsha Wind Power Plant” "Arm Wind" LLP "KAZPACO" LLP
2021 Construction of 100 MW Abay-1 Wind Power Station, Distribution cabinet of VT circuits  LLP "WPS 100 MW Abay 1" "Universal Energy Qazaqstan" LLP
2021 Construction of external power supply Berkarinskoye mining and metallurgical complex Arx Minerals (Arx Minerals B.V.) LLP  "PF Electroservice" LLP
2021 Construction of engineering networks for “Sputnik” town near Talgairan settlement (External power supply networks). Stage I (SCADA + Auxiliary service panel) "Atyrau City Construction Department" State Institution "GRAND-MASTER" LLP
2021 Repair of rotary excavator SRs(K)-2000 (Takraf) JSC "EEC" (Eurasian Energy Corporation) "ASEP" LLP
2021 Shield with cam-operated switches for the Aktogay mine camp "KAZ Minerals Aktogay" LLP "ICG" LLP
2021 Reinforcement of external power supply of Turkestan city (BMB of 8 modules, switchgears - 17 pcs., Auxiliary service panel, DC distribution panel, Distribution cabinet of VT circuits ) "KEGOC" Co., Ltd. "ASPMK-519" LLP
2021 Construction of a 100 MW SES in Balkhash. 220/20 kV substation and 220 kV overhead line (SCADA) "KAZ GREEN ENERGY (Kazakhmys Power Projects B.V.)" LLP "ASPMK-519" LLP
2021 Construction of nodal distribution substation “Ridder” with rearrangement of 110 kV transmission line switchgear "Kazzinc" LLP "ASPMK-519" LLP
2021 Construction of Schaulder Solar Electric Power Station (BMB of 9 modules +NXAirs 9 pcs). "Arm Wind" LLP "ASPMK-519" LLP
2021 Construction of 100 MW Solar Electric Power Station in Balkhash. 220/20 kV substation and 220 kV overhead line (communication) "KAZ GREEN ENERGY (Kazakhmys Power Projects B.V.)" LLP "ASPMK-519" LLP
2021 Reconstruction of switchgear-35kV of substation 110/35/6kV "Volynskaya" (Distribution cabinet of VT circuits ) "ArcelorMittal Temirtau" JSC "MK-Construction Group" LLP
2021 Construction of the Schaulder Solar Power Plant (RPA, Distribution cabinet of VT circuits and Auxiliary service panel, DC distribution panel and AC distribution cabinet AC-2)
"Arm Wind" LLP "ASPMK-519" LLP
2021 Construction of the 110/35/10kV, (Distribution cabinet of VT circuits) Communal State Institution “Department of Energy and Public Utilities of Almaty City” "EC ENERGY Qazaqstan" LLP
2021 Construction of engineering networks for “Sputnik” town near Talgairan settlement (External power supply networks). Stage I (ASCME) "Atyrau City Construction Department State" Institution "GRAND-MASTER" LLP
2021 Construction of external power supply Berkarinskoye mining and metallurgical complex (AC distribution cabinet AC-2). Arx Minerals (Arx Minerals B.V.) LLP  "ASPMK-519" LLP
2021 National Industrial Petrochemical Technopark" in Atyrau region (Karabatan and Tengiz sites). Engineering support facilities. Corridor of engineering networks. 1st stage. (Cell SM6) Managing Company FEZ “NINT” JSC "BAZIS Construction" LLP
2021 Strengthening of the power grid of the Western Zone Unified Electric Power System of the Republic of Kazakhstan. Construction of power grid facilities. Expansion of 220 kV open switchgear with installation of 2 controlled shunt reactor-220 kV substation 220 kV “Inder” (3 pcs. of SCADA cabinets). "KEGOC" Co., Ltd. "Siemens Energy" LLP
2021 Construction of external power supply to MMC Berkarinskoye (Lighting control cabinet 1 pc.) Arx Minerals (Arx Minerals B.V.) LLP  "ASPMK-519" LLP
2021 Strengthening of external power supply of Turkestan city "KEGOC" Co., Ltd. "Siemens Energy" LLP
2021 Construction of communication line Shymkent 220 - Southern Regional Dispatch Center. "KEGOC" Co., Ltd. “ENERGY RK” LLP
2021 Expansion of 110 kV Open Distribution 110 kV Substation 110/35/10 kV Shaulder, Turkestan Region (RPA and Distribution cabinet of VT circuits ) "Arm Wind" LLP "PromSpecStroyProject" LLP
2021 Construction of the Schaulder Solar Electric Power Station (ASCME) "Arm Wind" LLP "ASPMK-519" LLP
2021 Construction of the Schaulder Solar Electric Power Plant (SCADA: SCADA cabinet and AWP (administrative workplace) of ASCME) "Arm Wind" LLP "ASPMK-519" LLP
2021 Substation "Autobaza", 10 kV substation (16 switchgears-10 IE). "ASPMK-519" LLP "KaratalTransit" LLP
2021 Reconstruction of 110/6-6kV "RTI" substation in Karaganda region "Karagandy Zharyk" LLP "Arystan Building Company" LLP
2021 External power supply facilities of the 1st grade lime production plant at Saryopan deposit in Osakarov district of Karaganda region (HF cabinets) "Global Lime Industries" LLP/ "ТОО Saryopan Operating" LLP JSC "Electromontazh"
2021 Construction of 110/10 kV substation “Kokozek” with connection to 110 kV Open Distribution Unit of 220 kV substation “Kaskelen” of Karasay district, Almaty region (0.4 kV Auxiliary service panel) "Alatau Zharyk Company" JSC "SAB ENERGY" LLP
2021 Construction of external power supply to the mining and metallurgical complex (ASCME cabinet 1 pc.) "Arx Minerals (Arx Minerals B.V.)" LLP "ASPMK-519" LLP
2021 External power supply networks of 220 kV. Expansion of 220 kV switchgear-220 kV Kostanayskaya PS-1150 kV (Distribution cabinet of VT circuits) "KEGOC" Co., Ltd. “KAZTRANSFORMATOR” LLP
2021 Construction of Solar Electro-Stay Shulder (UPS Cabinet) "Arm Wind" LLP "ASPMK-519" LLP
2021 Power station 110/10kV South-2 (ASCME) State Institution "Department of Housing and Communal Services, passenger transport, highways, construction and housing inspection of the city of Temirtau" JSC "Electromontazh"

Year 2020

 

Year Project Counterparty
2020 “National industrial petrochemical technopark” in Atyrau region (Karabatan and Tengiz sites). engineering facilities of gas turbine power plant. Corridor of engineering networks. 1st stage"
"BAZIS Construction" LLP
2020 "Aman" Oil Refining Station
"ASPMK-519" LLP
2020 External power supply with connection of the second high-voltage input 220 kV Substation -220/35 kV from High Voltage Lines -2347 with installation of the 3rd transformer 125 MVA "ASPMK-519" LLP
2020 "Josaly" Auxiliary service panel "APS Energy Kazakhstan" LLP
2020 Substation "Data Center" in Petropavlovsk "ASPMK-519" LLP
2020 Server cabinet (SCADA) “FIRM VOSTOKMARKET” LLP
2020 The substation of the Ridder node distribution substation "ASPMK-519" LLP
2020 LV cabinets for 50 MW "Ybyrai" wind farm and 500/220/110/10 kV "Zarechnaya" substation "Zhel Elektrik" LLP
2020 Complete Transformer Substation 1600 kVA "Kazakhturkmunai" LLP
2020 External power supply with connection of the second 220 kV high-voltage input of 220 kV PS-220/35 kV from high-voltage Line-2347 with installation of the 3rd transformer 125 MVA "ASPMK-519" LLP
2020 Distribution board for "Zhuzagash" "ICG" LLP
2020 Complete Transformer Substation 400 kVA JV "KazGerMunai" LLP
2020 Complete Transformer Substation 40 kVA - 250 kVA in quantity of 41 pcs. JSC "Embamunaigas"
2020 RPA cabinets, switchgear cabinets for 220kV "Uralskaya" substation "Saryarqa-MS" LLP
2020 KAZNEX-8 pcs. for "Kyzylkia" gas piston power station "PetroKazakhstan Kumkol Resources" JSC
2020 Distribution cabinet of VT circuits for "Tengiz" "StroyEnergoService" LLP
2020 Complete Transformer Substation of Block-Modular Type №1 1600kVA, №2 2500kVA, №3 1000kVA "BAZIS Construction" LLP
2020 External power supply "RG Gold" "ASPMK-519" LLP
2020 Supply of relay protection, SCADA and ASCME "Cascade KHPP" LLP
2020 Construction of 100 MW Solar Power Station in Balkhash. 220/20 kV substation and 220 kV overhead line "ASPMK-519" LLP
2020 Underground Mine of "Altyntau Kokshetau" LLP ("Vasilkovsky" GOK) "ASPMK-519" LLP
2020 Strengthening of external power supply of Turkestan city "SIEMENS" LLP
2020 Power supply to the Ketekazgan field, SCADA and HF communications "CNEC" LLP
2020 Substation 110/6 kV "Strezhanskaya" "ASPMK-519" LLP
2020 UPS cabinet for "Chizhinskaya" HPP-2 "ASPMK-519" LLP
2020 Modernization of "Zhezkazgan" Thermal Power Plant "ASPMK-519" LLP
2020 Substation "Krasnoarmeyskaya", AC distribution cabinet AC "Kazbailyk Astana" LLP
2020 ATS expansion "KAZAKSTAN GARYSH SAPARY" JSC
2020 Assembly of 2 RPA cabinets for "ANSA SILICON" "SIEMENS" LLP
2020 Construction of 110 kV overhead line from pylon No.9 to pylon No.176 of Semey city "ASPMK-519" LLP
2020 Strengthening of external power supply of Turkestan city "ASPMK-519" LLP

Year 2019

 

Year Project Counterparty
2019 Power supply of infrastructure of geotechnological polygons M1 at Site No.1 South and TS3 Ph1 and TS2 Ph5 at Site No.2 Tortkuduk of Moinkum deposit in Suzak district, Turkestan region. Complete-Transformer Substations-630/10/0,4-U1 in quantity of 8 pcs. "Spectr Energy Group" LLP
2019 Reconstruction of KXII type switchgear cells at 220 kV "Stroitelnaya-2" substation "ASPMK-519" LLP
2019 Protection cabinet of transformer for "Kaspiy Cement" LLP "ASPMK-519" LLP
2019 Containers for mining "HOLIC SERVICES" SA
2019 Substation 220 kV SEZ «National industrial petrochemical technopark» (Karabatan)    "ASPMK-519" LLP
2019 Construction of off-site engineering networks to Kunai residential area, Kostanai city "ELMO" JSC
2019 KIOSKS FOR RTUs BVS "KMG Automation" LLP
2019 Mining site "Qazaq DCS" LLP
2019 Construction of High Voltage Line-110 kV “Ilyinka-Akmolinskaya”, Substation "Batys" "Mehkolonna No. 13" LLP
2019  SCADA for West Tuzkol "ASPMK-519" LLP
2019 Container for mining (40 foot container) "Qazaq DCS" LLP
2019 Container for mining (20 foot container) "Qazaq DCS" LLP
2019 Solnechnaya ElektroStation Agadyr "Karelektrospetsstroy" LLP
2019 External power supply cell for substation Stroitelnaya-2 "ASPMK-519" LLP
2019 500/220kV/110/10/6kV substation “Shu”, 220kV/10-10kV substation of Solnechnaya Electric Station “Shu” "SIEMENS" LLP
2019 "Medical Center" module "ASPMK-519" LLP
2019 Maintenance of ASCME at HPP Lepsy-2 "HPP Lepsy-2" LLP
2019 3 cells SM6 Aktogay (Zhuzagash) "Industrial Construction Group" LLP
2019 Concentration Unit Project  LLP "SP KATKO”
2019 Reconstruction of protection cabinet (RPA) 35 kV, for two lines High-voltage Line-4 and High-voltage Line-5 of substation Tekeliyskaya Thermal Electric Center 2 "Tekeli Energy Complex" LLP
2019 Communication equipment "Mehkolonna No. 13" LLP
2019 RPA cabinets for 30 MW Jalagash Solar Power Station "АВВ" LLP
2019 0.4 kV Auxiliary service panel "APS Energy Kazakhstan" LLP
2019 Establishment of a dispatch situation center for energy facilities of "Uranenergo" LLP "Uranenergo" LLP
2019 Office building for “ASPMK-519" LLP "ASPMK-519" LLP
2019 "Chizhinskaya" HPP- 2 "KaratalTransit" LLP
2019 "Kursai" substation (DMVA cell) "Vertical-T" LLP
2019 External power supply of housing estate in Saryozek settlement. Saryozek, Kerbulak district, Almaty region (Module + Nxairs) "ELMO" JSC
2019 Accounting cabinets for Kyzylorda "ASPMK-519" LLP
2019 Zhambyl oblast. Substation 220/10 kV “Shu” "ASPMK-519" LLP
2019 SCADA, ASCME for Kyzylorda "ASPMK-519" LLP
2019 Supply and installation of modern electricity metering devices at substations and connection to ASCME in Kyzylorda city "ASPMK-519" LLP
2019 Server cabinet of SCADA system, Video wall of 12 monitors 55", cabinet of guaranteed power supply system, ARM, SCADA and ASCME system. "ASPMK-519" LLP
2019 SCADA, Automatic Dispatch Control System for western Tuzkol "CNEC" LLP
2019 Construction of a 4.95 MW solar power plant in Ushtobe city "AlmatyEnergoProject" LLP
2019 Modernization of station automation telemechanics and telecommunication devices of the Power Center of Mailytogai Passenger Terminal "LokoTech - Signal Asia" LLP
2019 Switchboard (Aktogay) "Industrial and Construction Group" LLC
2019 Power supply of Feed Mill and Elevator of "FENIX FID MILLS" LLP "ASPMK-519" LLP

Year 2018

 

Year Project Counterparty
2018 “Compressor Station-5 Shu” works on design, manufacture, supply, installation and commissioning of low-voltage switchgear JSC "OGCC KazStroyService"
2018 “Compressor Station-7 Issyk” works on design, manufacturing, supply, installation and commissioning of low-voltage switchgear JSC "OGCC KazStroyService"
2018 Supply of Mobile substation 35-6-0.4-9MVA ТОО "KAZ Minerals Aktogay"
2018 Assembly services of low-voltage compartments of 20 kV switchgear equipment, type NxPlus_C "SIEMENS" LLP
2018 Supply of equipment for Mynkuduk substation (2nd stage) "Andas-Group" LLP
2018 Establishment of an energy dispatch center "KaratalTranzit" LLP
2018 Construction of 220kV switchgear at "Pavlodarskaya" substation 110kV "TPEP" LLP
2018 Design, manufacture, supply and commissioning of electrical equipment, communication systems, SCADA, ASCME for “10/0.4 kV substation” in Kyzylorda. "ASPMK-519" LLP
2018 Integration of the ASCME system “HPP-1” into the ASCME system of “Karatal Cascade HPP-2 ” LLP and organization of data transmission channels. Carrying out pilot industrial tests. "Karatal HPPs Cascade" LLP
2018 Design, manufacture, supply and commissioning of 0.4 kV switchgear under the project “Construction of 220-110-10 kV substation, Shieli village”. "OIL POWER ENGINEERING" LLP
2018 Cabinet redesign and assembly services "Schneider Electric" LLP
2018 Power equipment and engineering "Power Equipment and Engineering" LLP
2018 Reconstruction of power supply "Electroservice" LLP
2018 Design, manufacture, supply and commissioning of electrical equipment, communication systems, SCADA, ASCME for “Zhairemsky GOK” in Zhairem settlement, Karaganda region, RK "ASPMK-519" LLP
2018 Design, supply and commissioning of communication system equipment for 110-30kV substation Solar Electric Station “Saran” "ASPMK-519" LLP
2018 Design, manufacture and supply of domestic buildings for “ASPMK-519 LLP” "ASPMK-519" LLP
2018 Design, manufacturing, supply and commissioning for Protection cabinet of transformer under the project “Construction of 110-10kV substation of Chizhinskie HPPs”. "ASPMK-519" LLP
2018 Design, manufacture, delivery and commissioning of DC-4 cabinets "PROMENERGOSNAB-KZ" LLP
2018 Design, supply and commissioning of communication system equipment for "Zhairemsky GOK" "ASPMK-519" LLP
2018 Designing, manufacturing and delivery with installation works of BMB for the project “Optimization of neutral operation mode of 220-35-10kV GTP 220-35-10kV”. "Aktobe Prilad" LLP
2018 Designing, manufacturing, supply and commissioning of switchboard under the project “YUKGRES substation reconstruction of 220 kV switchgear-220 kV”. LLP "Firma “LAN”
2018 Design, manufacture, supply and commissioning of BMB, electrical equipment, communication systems, SCADA, ASCME under the project “Substation-220kV SES-Baikonur” "ASPMK-519" LLP
2018 Design, manufacture, supply and commissioning of RPA for “Zhas-Orken substation”. JSC “ELMO”
2018 Design, manufacture, supply and commissioning of SCADA cabinets for the project “Tulkubas 220kV sectional type transformer substation, Burnoye 220kV sectional type transformer substation”. "ALMATY KERNEU ELECTRIC" LLP 
2018 Services on assembly of low-voltage compartments of 10 kV switchgear equipment, type NxAir under the project “Aktobe Ferroalloy Plant” "SIEMENS" LLP 
2018 Design, manufacture, supply and commissioning of 1600kW switchgear switchgear for the project “Lukoil Motor Oil Plant” "PSM" Co.
2018 20 kV switchgear assembly for "Solar Power Station "Baikonyr" "ASPMK-519" LLP
2018  Design, manufacture, supply and commissioning for Distribution cabinet of VT circuits under the project “Reinforcement of Pavlodar Power Station” Construction and installation firm "Mekhkolonna No. 59" LLP
2018 Set of works on replacement of the existing 0.4 kV switchgear switchgear “KATCO” JV  LLP
2018 Design, manufacture, supply and commissioning of the Distribution cabinet of VT circuits for the "Sarbaiskie Trunk Power Grids" project Construction and installation firm "Mekhkolonna No. 59" LLP
2018 Services on putting into commercial operation of ASCME of "KaratalTranzit" LLP "KaratalTranzit" LLP
2018 Design, supply and commissioning for SCADA for "Tekeli CHP" project "Tekeli Energy Complex" LLP
2018 Design, supply and commissioning for Communication Systems under the project “Modernization of Communication Networks of ASPMK-519 LLP Holding”. "ASPMK-519" LLP
2018 Design, manufacturing, supply and commissioning of SCADA and Communication Systems under the project “Creation of SCADA system for Korinskaya HPP”. "Korinskaya HPP" LLP
2018 Design, supply and commissioning of equipment of communication and system of RDC “AMES” Almaty city "KaratalTranzit" LLP
2018 Design, supply and commissioning of SCADA system for HPP Lepsy-2 "HPP Lepsy-2" LLP
2018 Design, manufacturing, supply and commissioning for the project “Replacement of Auxiliary service panel at Ekibastuzskaya substation” LLP "Firma “LAN”
2018 Design and commissioning of fiber-optic communication line, RPA, ASCME, communication under the Chizhinskaya HPP project "ASPMK-519" LLP
2018 Design, supply and commissioning of SCADA, under the project Creation of SCADA system for “Karatal HPPs Cascade”. "Karatal HPPs Cascade" LLP

Year 2017

 

Year Project Counterparty
2017 Design, installation, testing and delivery according to the project Assembly services of cabinets for "Tengizchevroil" (24 sets) "Schneider Electric" LLP
2017 Design, manufacture, supply and commissioning of electrical equipment for the project Distribution substation Astana, Sorokovaya "ASPMK-519" LLP
2017 Design, manufacture, supply and commissioning of Distribution board for SB&K project (0.4 kV switchgear) LLP “TTS Astana 2007”
2017 Development of Astana railroad hub, including construction of station complex. Connecting track Astana passenger station - Astana station. Astana "ASPMK-519" LLP
2017 Design, installation, testing and delivery according to the project Assembly services of cabinets for "Tengizchevroil" (50 sets) "Schneider Electric" LLP
2017 Design, manufacture, supply and commissioning of electrical equipment, Distribution cabinet of VT circuits, ASCME, Dispatching and technological control system SCADA for the project External power supply of HPP-2 on the Lepsy River "ASPMK-519" LLP
2017 Design, manufacture, supply and commissioning of Complete Transformer Substation 630 kVA in the amount of 3 pieces and all electrical equipment included in their composition “KATCO” JV  LLP
2017 Works on Verification of the measuring complex of electricity metering under the project of "Karatal HPPs Cascade" LLP "Karatal HPPs Cascade" LLP
2017 Designing, manufacturing, supply and commissioning of switchgear and controlgear, LVD, RPA, SCADA for the project Reconstruction of 110-35-10kV "Mynkuduk" substation "Andas-Group" LLP
2017 Design, manufacture, supply and commissioning of feeder input device and automatic standby switching cabinet under the project Construction of Zhezkazgan-Beyneu railway line "Samga" LLP
2017 Design, manufacture, supply and commissioning of switchgear and switchboards for spacecraft assembly and test complex (10AkV switchgear) LLP “TTS Astana 2007”
2017 Design, manufacture, supply and commissioning of the ASCME system for the "Karatal HPPs Cascade" LLP project "Karatal HPPs Cascade" LLP
2017 Design, manufacture, supply and commissioning of Distribution cabinet of VT circuits, RPA, ASKME under the project of reconstruction of 110-35-10 "Mynkuduk" substation "Andas-Group" LLP
2017 Design, manufacturing, supply, and commissioning of SCADA, AMR (Automated Meter Reading), PCS (Process Control System), and protection & automation systems for the substation projects: Kuryk, Yersai, 10-0.4 kV, and 110-10 kV. "ASPMK-519" LLP
2017 Overhaul with pipeline replacement at section 1001.9 km – 1187.5 km of the TON-2 oil trunk pipeline. "ASPMK-519" LLP
2017 Standard automation interface for boiler systems integrated with SCADA. Western Branch of JSC "KazTransOil" JSC "KazTransOil"
2017 Design, manufacturing, supply, and commissioning of Distribution cabinet of VT circuits and outdoor switchgear control panels for 220/110 kV substations at the pumping stations of the 'S. Satpayev Canal' branch. "SC Asia" LLP
2017 Design, manufacturing, supply, and commissioning of fan control panels for the project of "CITCO KAZAKHSTAN LLP" "CITCO KAZAKHSTAN" LLP
2017 Office of "KARATALTRANSIT LLP" in Taldykorgan city, 169th 110kV Substation 'Cement Plant', 110kV Substation 'HPP-4', Integral Central Distribution Point, RP-2 Temirbeton Distribution Point, RP-3 Metakon Distribution Point, RP-4 Energo REM Distribution Point "KARATALTRANSIT LLP"
2017 External power supply for HPP-2 on the Lepsy River to the 110/10 kV 'Kora' substation "ASPMK-519" LLP
2017 Installation and commissioning of AMR (Automated Meter Reading) and communication systems for: 35/10kV Substation 'Rudnik PSV' at Zarechnoye JV,  110/35/10kV Substation 'Koksaray'" "Benatech" LLP
2017 Major overhaul with pipeline replacement at section 1001.9 km - 1187.5 km of the TON-2 main oil pipeline "ASPMK-519" LLP
2017 Design, supply, and commissioning of a VFD (Variable Frequency Drive) cabinet for conveyor motor. "EuroChem-Karatau" LLP
2017 Design, supply, and commissioning of SCADA and RTU systems for Aktau, Karazhanbas, and Kalamkas facilities "ASPMK-519" LLP
2017 Installation, wiring, and commissioning of protection and automation (P&A) systems for LUKOIL lubricants plant "ASPMK-519" LLP
2017 Design, manufacturing, supply, installation/wiring, and commissioning of 10 kV auxiliary power switchgear for "TK Metakon" LLP TK Metakon" LLP
2017 Design, manufacturing, supply, installation/wiring, and commissioning of modular buildings (BMB), LV switchgear, and protection/control panels for "Burnoe 2" "SIEMENS" LLP 
2017 Design, manufacturing, supply, installation/wiring, and commissioning of HV switchgear for 220-110-10 kV 'Taugul' substation "SIEMENS" LLP 
2017 Design, manufacturing, supply, installation/wiring, and commissioning of AMCS (Automated Metering and Control System) for 110/10 kV "Kora" substation "Korinskaya HPP" LLP
2017 Design, manufacturing, supply, installation/wiring, and commissioning of package substations "SpectrEnergyGroup" LLP 
2017 Design, manufacturing, supply, installation/wiring, and commissioning of AMI systems for 35/10 kV 'Rudnik PSV' substation at Zarechnoye JV, 110/35/10 kV 'Koksaray' substation" "Benatech" LLP
2017 ATS panel and materials (AEREC. Industrial Zone-City Substation. Communication Systems section) "Duos-Kart" LLP
2017 Design, manufacturing, supply, installation/wiring, and commissioning of 8 control cabinets for Tengizchevroil LLP (TCO) "Schneider Electric" LLP
2017 Construction of the Zhezkazgan-Beyneu railway (Shalkar-Beyneu section), including external power supply infrastructure and telecommunications systems. "Promstroy-Energo" LLP
2017 Turnkey implementation of AMI system for 110-35-10 kV substation, including design, production, supply, installation, and commissioning of metering and data collection infrastructure. "ASPMK-519" LLP

Year 2016

 

Year Project Counterparty
2016 Turnkey construction of 220/35/10 kV substation with associated infrastructure for the Chemical Park Special Economic Zone in Taraz "KazHiTechEuroBuild" LLP
2016 Turnkey delivery of railway control systems (SCADA and AMI) for the Arkalyk-Shubarkul line, covering design, supply, installation, and commissioning between Arkalyk Station and Shubarkul Station. "ASPMK-519" LLP
2016 Design, manufacturing, supply, installation/wiring, and commissioning of package substations for 'KhimParkTaraz "KazHiTechEuroBuild" LLP
2016 SCADA-based telecontrol system for 'Zapadny Mynkuduk' substation "Uranenergo" LLP
2016 Implementation of telecontrol systems for railway power supply infrastructure between Zhezkazganskaya and Saksaulskaya stations, including SCADA integration with EC-12 Agadyr dispatch center (Karaganda-Sortirovochnaya) "ASPMK-519" LLP
2016 Design and construction of 110 kV grid connection for HPP-2 (Lepsy River), including step-up substation and transmission lines "ASPMK-519" LLP
2016 "Dunga-4 35/10 kV" substation and 10 kV overhead power line "Engineering Procurement Services Kazakhstan" LLP
2016 Implementation of centralized SCADA-based dispatch control system (SDTU) for Borzakty Station railway infrastructure "ASPMK-519" LLP
2016 Construction of second track on Almaty 1 - Shu section "ASPMK-519" LLP
2016 Implementation of AMI data collection and transmission system for Substation No. 25 "Koylyk", including JSC "TATEK"
2016 Construction of 35/10 kV 'Industrialnaya' substation to power the 'Khorgos - Eastern Gate' industrial zone "ASPMK-519" LLP
2016 Внешнее электроснабжение по проекту гостиничный комплекс с жилыми апартаментами в г.Астана "NurlyZholyConstruction" LLP
2016 Manufacture of metal structures "Zhetysu Mazhiko Agrocomplex" LLP
2016 Design, manufacturing, commissioning (CОМ), and installation/wiring (I&W) of AMI system for Atyrau, ‘PS-663km "Electroservice" LLP
2016 Construction of a 110 kV bay at 220-110-10 kV Substation No. 152 "Energo-REM" LLP
2016 Turnkey delivery of 630 kVA package substation (10/0.4 kV): design, manufacturing, I&W, and COM “KATCO” JV  LLP
2016 "Assembly services for UPS distribution panels for TCO" "Schneider Electric" LLP
2016 Second track construction on Almaty-1 – Shu section (telemechanics) "ASPMK-519" LLP
2016 Construction of power transmission line for the 'Alaigyr' field: 110/6 kV 'Alaigyr' substation, 220/110/6 kV 'Akchatau' substation "ASPMK-519" LLP
2016 "Commissioning (COM) and supervised installation (SIV) of 0.4 kV switchgear for JSC 'PNHZ'" "SIEMENS" LLP 
2016 Construction of a backup power transmission line at the Kora River and wastewater treatment plant "SEC Garant" LLP
2016 27.5 kV distribution point (DP) for Astana railway complex: sections Astana Station – Sorokovaya Station, Astana-Passazhirskaya Station – Astana Station "ASPMK-519" LLP
2016 "Second track construction on Almaty-1 – Shu section (telemechanics, Shokpar Station) "ASPMK-519" LLP
2016 Design, manufacturing, commissioning (COM), and supervised installation (SIV) of portable 0.4 kV switchgear for 'Yersai KK'" "ASPMK-519" LLP
2016 Assembly and Test Complex (ATC) – Expansion Phase LLP "TTS Astana-2007 K"
2016 Design, manufacturing, commissioning (COM), and supervised installation (SIV) of a 6 kV switchboard for the sulfide ore processing plant. Aktogay. 220 kV 'Kyzylordinskaya' substation, Republic of Kazakhstan, Kyzylorda Region "Global Engineering Solutions" LLP
2016 Design, manufacturing, commissioning (COM), and supervised installation (SIV) of portable 0.4 kV switchgear for 'Yersai Caspian Contractor "ASPMK-519" LLP
2016 Design, manufacturing, commissioning (COM), and supervised installation (SIV) of KTPN-100-10-0.4 kV outdoor package substation for the Korinskaya HPP project "ASPMK-519" LLP
2016 Design, manufacturing, commissioning (COM), and supervised installation (SIV) of mast obstruction lighting system and lighting control panels for masts "ASPMK-519" LLP
2016 "Design, manufacturing, commissioning (COM), and supervised installation (SIV) of AMI (Automated Metering Infrastructure) equipment for "ASPMK-519" LLP needs "ASPMK-519" LLP
2016 Expansion of 110 kV outdoor switchgear (OSG) at Substation SS-152 "ASPMK-519" LLP
2016 Reconstruction works for 220-110-10 kV Substation No. 147 "Taugul" "SIEMENS" LLP 
2016 Design, manufacturing, commissioning (COM), and supervised installation (SIV) of Automated Metering Infrastructure (AMI) Branch of "Elster Metronica" LLC
2016 Construction of Zhezkazgan-Beyneu railway line, power supply works "ASPMK-519" LLP

Year 2015

 

Year Project Counterparty
2015 Reconstruction of the pump filtration station LLP “TTS Astana 2007”
2015 "Aktogay (Cable Repair Module)" "PSI ENERGY & CONTROL" LLP 
2015 110/10 kV 'Rudnichnaya' Substation "ASPMK-519" LLP
2015 "KarGES-4" and "Zharkent-2" Substations "ASPMK-519" LLP
2015 Reconstruction of 220 kV 'Bukhtarminskaya' Hydroelectric Power Plant Substation "ASPMK-519" LLP
2015 Distribution board (DB) for a shift camp "ASPMK-519" LLP
2015 HimparkTaraz "KazHiTechEuroBuild "LLP
2015 "Kaskelen Substation" "ASPMK-519" LLP
2015 Linear compressor station "KS-7 Chilik" "NGSK KazStroyService" JSC
2015 Linear compressor station "KS-5 Taraz" "NGSK KazStroyService" JSC
2015 Server cabinet "Global Engineering Solutions" LLP 
2015 Installation works (IW) and commissioning works (CW) for the 'Dry Port' facility "ASPMK-519" LLP
2015 Installation works (IW) and commissioning works (CW) for the 'Khorgos" facility "ASPMK-519" LLP
2015 Installation works (IW) and commissioning works (CW) for the 'Zharkent-2" facility "ASPMK-519" LLP
2015 SCADA + AMI (Automated Metering Infrastructure) + Installation Works "ASPMK-519" LLP
2015 Installation and commissioning works for the "KarGES-4" project "ASPMK-519" LLP
2015 Khorgos: Design, manufacturing, supply, commissioning (COM), and supervised installation (SIV) of Automated Metering Infrastructure (AMI) "ASPMK-519" LLP
2015 Project for manufacturing, supply, commissioning (COM), and supervised installation (SIV) of telemechanics for the Dispatch and Process Control System (DPCS) "ASPMK-519" LLP
2015 Design, Manufacturing, Supply, Installation & Commissioning (I&C), and Cable Works for Auxiliary Power Switchgear (APS) and Modular Building for the 'Ulken' Project "SIEMENS" LLP 
2015 Design, Manufacturing, Supply, Installation & Commissioning (I&C), and Cable Works for Modular Buildings at the Karazhal Baryte Plant "Electroservice" LLP
2015 Design, Manufacturing, Supply, Installation & Commissioning (I&C), and Cable Works for Telemechanics System "ASPMK-519" LLP
2015 Design, Manufacturing, and Supply of Vandal-Proof Enclosure "Alasam" LLP
2015 Turnkey Project for Oil Pumping Station «NPS-663 Novaya» "Electroservice" LLP
2015 Design, Manufacturing, Delivery, Commissioning and Cable Works for 4 Switchgear Cells at WPS-667 "Electroservice" LLP
2015 Line Protection Panel with Automatic Line Auto-Reclosing (ALAR) for "KarHPP-4" Project "ASPMK-519" LLP
2015 Extension Works for "Beyneu 110kV Substation" (W11G) "Electroservice" LLP
2015 External Power Supply for WPS-667 of Astrakhan-Mangyshlak Water Pipeline. Design, Manufacturing, and Cable Works for Modular Buildings "Electroservice" LLP
2015 Design and Manufacturing Works for Feeder Incoming Unit under "Arkalyk-Shubarkol" Project "KAZPACO" LLP 
2015 Supervised Installation Works for "Lepsy HPP-2" Project "ASPMK-519" LLP
2015 Design, Manufacturing and Panel Assembly Works for Packaged Distribution Substation under "Zhuzagash" Project "PSI ENERGY & CONTROL" LLP 
2015 Design and Manufacturing of K-59 Switchgear Cell for "Turkmenistan" Project "ASPMK-519" LLP
2015 Design and Manufacturing of Reactor Protection and Control Panel "PSI ENERGY & CONTROL" LLP 
2015 Design, Manufacturing, Commissioning, and Cable Works for Automated Monitoring and Control System (AMCS) Workstation under "Zharkent" Project "Global Engineering Solutions" LLP 
2015 110 kV Outdoor Switchgear Extension at "Substation 152" "ASPMK-519" LLP
2015 Design, Manufacturing, and Commissioning of Automated Electricity Metering System (AEMS) for Koskol Railway Station "ASPMK-519" LLP
2015 Design, Manufacturing, and Commissioning for "ZhaiykMunai. Chinarevskoye Field" Project "BEI-Electro" LLP 
2015 Design, Manufacturing, and Commissioning of Package Transformer Substation (PTS) for "ChemParkTaraz" "KazHiTechEuroBuild" LLP
2015 Design, Manufacturing, and Commissioning of Custody Transfer Station at 1237 km of Uzen-Atyrau-Samara Oil Pipeline (Adjustment Works) "ASPMK-519" LLP
2015 Installation and Commissioning (I&C) of Prefabricated Modular Building for Water Pumping Station "WPS-667" "Electroservice" LLP
2015 Integrated Supervisory Control and Data Acquisition (SCADA) System for Power Facilities of "Uranenergo" LLP "Uranenergo" LLP
2015 Integrated Manufacturing, Supply, and Cable Works for Compressor Module under "Aktogay" Project "PSI ENERGY & CONTROL" LLP 
2015 Implementation of a Dispatch Center (DC) in Ashgabat for monitoring and control of power grid/transport infrastructure (specify if needed) "ASPMK-519" LLP
2015 Design, Manufacturing, Installation & Commissioning (I&C), and Cable Works for Lighting Panel at Bukhtarma Hydroelectric Power Plant (HPP) "ASPMK-519" LLP
2015 Design, Manufacturing, and Installation & Commissioning (I&C) of "Koyan-Kos Substation" "Saiman Corporation" LLP
2015 Design, Manufacturing, and Installation & Commissioning (I&C) of Server Rack for "KaratalTransit" LLP "KaratalTransit" LLP
2015 Design, Manufacturing, Installation & Commissioning (I&C), and Cable Works for Modular Buildings at Hydroelectric Power Plant (HPP) "ASPMK-519" LLP

Years 2013-2014

 

Year Project Counterparty
2013-2014 Design, Manufacturing and Supply of Equipment for Outdoor Switchyard (OIS) under "Koskol OIS" Project "ASPMK-519" LLP
2013-2014 Design, Manufacturing and Equipment Supply for "Tortkuduk" Project “KATCO” JV  LLP
2013-2014 Design, Manufacturing and Supply of Multiplexer Equipment "Electromarket" LLC
2013-2014 Design, Manufacturing and Equipment Supply for "Turkmenistan" Project "ASPMK-519" LLP
2013-2014 Design, Manufacturing and Supply of Multiplexer for "Shalkar" Substation "ASPMK-519" LLP
2013-2014 Design, Manufacturing and Equipment Supply for "Aktogay" Project "PSI ENERGY & CONTROL" LLP
2013-2014 Design, Manufacturing and Equipment Supply for "Yersay" Project "ASPMK-519" LLP
2013-2014 Design, Manufacturing and Equipment Supply for "Dry Port" Project "TVN-Energiya" LLP
2013-2014 Design, Manufacturing and Equipment Supply for "Severnaya" Substation "Moldir" LLP
2013-2014 Design, Manufacturing and Equipment Supply for "Shkolnaya" Substation "Spetselektra" LLP
2013-2014 Design, Manufacturing and Equipment Supply for "CRP-5" Central Distribution Point "Integral" LLP
2013-2014 Design, Manufacturing and Equipment Supply for "Ural Airport" Project "BEI-Electro" LLP
2013-2014 Design, Manufacturing and Equipment Supply for "Burnoye" Solar Power Plant "ASPMK-519" LLP
2013-2014 Design, Manufacturing and Equipment Supply for "TP-2" Transformer Substation "Metacon" LLP
2013-2014 Design, Manufacturing and Supply of Multiplexer Equipment "ASPMK-519" LLP
2013-2014 Design, Manufacturing and Equipment Supply for "Khorgos" Project "ASPMK-519" LLP
2013-2014 Design, Manufacturing and Equipment Supply for "Aktogay" Mining and Processing Plant "PSI ENERGY & CONTROL" LLP
2013-2014 Design, Manufacturing and Equipment Supply for "Vostochny Karazhanbas-2" Oil Field "NSK" LLP
2013-2014 Design, Manufacturing and Equipment Supply for "Akzhar" Substation "Baily" LLP

Year 2012

 

Year Project Counterparty
2012 Design, Manufacturing and Equipment Supply for Tekeli CHP-2 "ASPMK-519" LLP
2012 Design, Manufacturing and Equipment Supply for CHP-1 of "AZhK" JSC "ASPMK-519" LLP
2012 Construction of Industrial Park Infrastructure in Karaganda "ASPMK-519" LLP
2012 National Power Grid Modernization. Phase II: 500/220/6 kV Substation at South Kazakhstan State District Power Plant and 220/35/6 kV "Stroitelnaya" Substation "ASPMK-519" LLP
2012 Construction of "Bolashak – Turkmenistan Border" Railway Line (Bolashak Station Section) "ASPMK-519" LLP
2012 35 kV Overhead Line between 110/35/6 kV "Karatal HPP-3" Substation and 110/35/6 kV "Tekeli CHP-2" Substation "ASPMK-519" LLP
2012 Design, Manufacturing and Equipment Supply for "Khoros" and "Zharkent" Substations "ASPMK-519" LLP
2012 Reconstruction of 35/6 kV "Kostenko" and 35/6 kV "Novaya Dubovka" Substations "ASPMK-519" LLP
2012 Project: Modernization of the National Power Grid (NPG) "ASPMK-519" LLP
2012 Project: Design, Manufacturing, and Equipment Supply for Uzen, Bolashak, and Bopay Stations "ASPMK-519" LLP
2012 Comprehensive engineering services including design, production, and delivery of specialized equipment for a large-scale infrastructure project in Astana, Kazakhstan. The scope covers technical documentation, quality control, logistics, and compliance with international standards. "Spetselektra" LLP
2012 Turnkey engineering solutions covering design, production, and delivery of industrial equipment for a major project in Almaty, Kazakhstan. The project includes technical development, manufacturing supervision, quality assurance, and logistics management in compliance with industry-specific standards (e.g., ISO, GOST, or customer specifications). "Innovalex" LLP
2012 Design, Manufacturing and Supply of Equipment for 500 kV Substations Central Hub Substations, «Yesil», «Atbasar», «Kokshetau», «Krasnoarmeyskaya» and 220 kV «Sarbaiskie MES», «Centralnaya» Substations "ASPMK-519" LLP
2012 220 kV Substations «Sary-Ozek», «Stroitelnaya», «Zavodskaya» Construction and Commissioning Works "ASPMK-519" LLP
2012 Integrated Works Execution for 500/220/6 kV "YKGRES" Substation and 220/35/6 kV "Stroitelnaya" Substation  "ASPMK-519" LLP
2012 Comprehensive upgrade works for Central Interconnected Power System's 220 kV 'Akchatau' Substation "ASPMK-519" LLP
2012 Comprehensive modernization of Northern Interconnected Power System's 220 kV 'Ekibastuzskaya' Substation "ASPMK-519" LLP
2012 Comprehensive modernization of 220 kV 'Nikolskaya' Substation "ASPMK-519" LLP
2012 "Comprehensive modernization of Sarbai Interconnected Power System: 220 kV 'Centralnaya' Substation" "ASPMK-519" LLP
2012 Comprehensive field development works at the 'Yuzhny' (Southern) deposit, Moyynkum, Suzak District, South Kazakhstan Region "SPF Montazhspetsstroy" LLP
2012 Comprehensive works at the Shulbinskaya HPP (Shulba Hydroelectric Power Plant) "ASPMK-519" LLP
2012 Comprehensive works for the 'New Tailings Storage Facility' project at the Nurkazgan Concentrator Plant "Proektmontazhtechnologiya" LLP
2012 "Design, Manufacturing, and Equipment Supply for the Akmolinskiye, Sarbayskiye, Severnye Power Grid Projects "ASPMK-519" LLP
2012 Design, Production, and Supply of Equipment Components "Nao Energy" LLP
2012 Design, Manufacturing and Supply of Equipment for the 'Severnye Buzachi' Project "Oil Service Company" LLP
2012 Design, Manufacturing and Supply of Equipment for Protection Relay and Automation Services "KEGOC" Co., Ltd.
2012 Design, Manufacturing, and Supply of Equipment "NOVA Stroy" LLP
2012 Design, Manufacturing, and Supply of Equipment "Schneider Electric" LLP
2012 Comprehensive works at the industrial site of LLP "Altyntau Kokshetau", Konyrbai Rural District, Zerenda Region, Akmola Province "Altyntau Kokshetau" LLP
2012 Design, Manufacturing, and Supply of Equipment "Spetselektra" LLP
2012 Design, Manufacturing and Supply of Equipment for the Kyzylorda City Project "PetroKazakhstan Kumkol Resources" LLP

Year 2011

 

Year Project Counterparty
2011 Design, Manufacturing and Supply of Switchgear for 'Cement Plant' Substation Project, 110kV 'Kuyulus' Distribution Point "ASPMK-519" LLP
2011 Design, Manufacturing, Supply, Supervised Installation, and Commissioning of AMR System for JSC "SK REK" "AS Equip KZ" LLP 
2011 Design, Manufacturing and Supply of Equipment for the "Asian Gas Pipeline" Project LLP IP "Borusan Makina Kazakhstan"
2011 Design, Manufacturing and Supply of Switchgear for the 'Mynaral-Cement' Project "ASPMK-519" LLP
2011 Design, Manufacturing, Supply, Supervised Installation, and Commissioning of LV/MV Switchgear for the Moynak HPP Project "Kerneu Limited" LLP 
2011 Comprehensive Works for Transformer Substation SSO1, Kokshetau Airport "BEI-Electro" LLP 
2011 Design, Manufacturing and Supply of Switchgear for the 'Dunga-2 35/10kV' Project "SIEMENS" LLP 
2011 Design, Manufacturing, Supply, Supervised Installation, and Commissioning of LV/MV Switchgear for Taldykorgan City JSC "TATEK"
2011 Design, Manufacturing, Supply, Supervised Installation, and Commissioning for the Railway Line Construction Project "Zhetigen-Korgas — State Border of RK" "IKEA TAS Group" LLP
2011 Design, Manufacturing, Supply, Supervised Installation and Commissioning of RP-8 'Zavodskaya' Distribution Point "Katsink-Energo" LLP
2011 Design, Manufacturing, Supply, Supervised Installation, and Commissioning for the Bashankol Field Project, Aktobe Region, Kazakhstan "Ada Oil Company" LLP
2011 Modernization of 1150kV, 500kV, and 220kV substations: Akmola, Sarbai, Northern, Almaty, Eastern, and Central Transmission Grids – National Power System Upgrade "ASPMK-519" LLP
2011 Design, Manufacturing, Supervised Installation, and Commissioning of OLTC & Metering Panels, Containerized Solutions, and Switchgear for the 110/35/10kV "Fabrika" Substation "ASPMK-519" LLP
2011 Design, Manufacturing, Supervised Installation and Commissioning of Control Station Panel (CSP) and Modular Buildings Package "PetroKazakhstan Kumkol Resources" JSC
2011 Design, Manufacturing, Supervised Installation, and Commissioning of Control Station Panel and Modular Building for Altynkol Station Project "Kazakhstan TJ-Ansaldo CTC Italy" LLP
2011 Design, Manufacturing, Supervised Installation, and Commissioning of Relay Protection & Automation Systems, Central Alarm Panel, Auxiliary Power Panel, DC Distribution Panel, and Modular Buildings (Outdoor Switchyard & Control Building) for "Vostochny Karazhanbas-2" Substation Project "TVN-Energiya" LLP
2011 Design, Manufacturing, Supervised Installation, and Commissioning of Modular Buildings for the 'Chaarat Winter Camp' Project "Practical Electrical Engineering" LLP
2011 "Design, Manufacturing, Supervised Installation, and Commissioning of Switchgear and Modular Buildings in Mynaral Village, Zhambyl Region "Zhambyl Cement Production Company" LLP

Year 2010

 

 

Year Project Description Contractor
2010 Design, manufacturing, and supply of switchgear cells for the "Kumkol" project LLP "Practical Electrical Engineering"
2010 Equipment supply and supervised installation works LLP "Schneider Electric"
2010 Design, manufacturing, supply, supervised installation, and commissioning of switchgear and modular buildings for the "Khorgos Substation" project LLP "ASPMK-519"
2010 Design, manufacturing, supply, supervised installation, and commissioning of auxiliary power panels LLP "Metacon"
2010 Design, manufacturing, supply, supervised installation, and commissioning of control station panels JSC "PNHZ"
2010 Design, manufacturing, supply, supervised installation, and commissioning of control station panels for the "UMR Warehouse, Kyzylorda, JSC PKKR" project LLP "Schneider Electric"
2010 Equipment and materials supply for the "Beyneu Substation" project LLP "ESAM-Alatau"
2010 Equipment and materials supply for the "Khorgos Substation" project LLP "ASPMK-519"
2010 Equipment and materials supply LLP "Spetselectra"
2010 Equipment and materials supply for the "35/6 kV '2A' Substation" project LLP "Aktau-EVIK"
2010 Equipment and materials supply for the "Opornaya Substation" project LLP "Sarsha"
2010 Equipment and materials supply for the "Myn-Aral Cement Substation" project LLP "Zhambyl Cement Production Company"
2010 Equipment supply for the "Atyrau Pump Station" project LLP "Schneider Electric"
2010 Equipment and materials supply for the "Cement Plant Substation" project LLP "ZhCPK"
2010 Equipment and materials supply for 0.4 kV switchgear for the "Moyynkum Field, LLP SP KATKO" project LLP "Practical Electrical Engineering"
2010 Equipment supply for the "Korkyt-Ata Airport" project LLP "BEI-Electro"
2010 Equipment supply in Almaty LLP "Tavrida Electric Astana"
2010 Design, manufacturing, and supply of equipment for the "Uzen–Turkmenistan State Border Railway Construction" project LLP "ASPMK-519"
2010 Equipment supply for the "Mynaral Substation" project LLP "ZhCPK"
2010 Equipment supply for the "Kymyz Kuduk Substation" project LLP "KaREM"
2010 Design, manufacturing, supply, supervised installation, and commissioning of containerized transformer substations (CTS) for the "YUKGRES Mynaral Substation" project "Watts Engineering"
2010 Design, manufacturing, and supply of equipment for the "Irtyshsky Mine Substation" (East Kazakhstan Region, RK) LLP "ESAM-Vostok"
2010 Design, manufacturing, and supply of AMR (Automated Meter Reading) systems for LLP "Uranenergo" LLP "Elst Metronika"

Year 2009

 

Year Project Description Contractor
2009 Design, manufacturing, commissioning, and supervised installation of a transformer substation LLP "Practical Electrical Engineering"
2009 Design, manufacturing, commissioning, and supervised installation of SCADA for the "Vasilkovsky GOK Substation" LLP "TVN-Energia"
2009 Design, manufacturing, commissioning, and supervised installation of LV/MV switchgear for the "Sairan Substation" project JSC "Almatyelectrosetstroy"
2009 Commissioning of equipment "ZhSU named after Zhansugurov"
2009 Design, manufacturing, commissioning, and supervised installation of switchgear for the "MynAralCement Substation" project JSC "Almatyelectrosetstroy" / LLP "Zhambyl Cement Production Company"
2009 Design, manufacturing, commissioning, and supervised installation of relay protection and automation (RPA) for the "110 kV OHL Aksu GRES, JSC EEC" project LLP "ASPMK-519"
2009 Design, manufacturing, commissioning, and supervised installation of a relay testing unit for the "110 kV OHL Aksu GRES, JSC EEC" project LLP "ASPMK-519"
2009 Design, manufacturing, commissioning, and supervised installation of an AMR (Automated Meter Reading) system for the "Karazhanbas Substation" project LLP "ASPMK-519"
2009 Design, manufacturing, commissioning, and supervised installation of switchgear and modular buildings for the "Myrzakolsky and Chaglinsky Water Intake" project LLP "ASPMK-519"
2009 Design, manufacturing, commissioning, and supervised installation of LV/MV switchgear for the "110 kV OHL Aksu GRES, JSC EEC" project LLP "ASPMK-519"
2009 Design, manufacturing, commissioning, and supervised installation of LV/MV switchgear for the "RP-3 Substation" project LLP "ASPMK-519"
2009 Design, manufacturing, commissioning, and supervised installation of switchgear and materials for the "Quarry Substation" project LLP "ASPMK-519"
2009 Design, manufacturing, commissioning, and supervised installation of equipment and materials for the "Eastern Industrial Zone Substation" project LLP "ASPMK-519"
2009 Design, manufacturing, commissioning, and supervised installation of LV/MV switchgear for the "Karatalskaya HPP-4" project LLP "ASPMK-519"
2009 Design, manufacturing, commissioning, and supervised installation of a central alarm panel for the "110/10/10 kV Eastern Industrial Zone Substation" project LLP "ASPMK-519"
2009 Design, manufacturing, commissioning, and supervised installation of an auxiliary power panel for the "Karazhanbas Substation" project LLP "ASPMK-519"
2009 Construction of the "Uzen–Turkmenistan State Border" railway line: Telemechanization of power supply devices for the Uzen-Bolashak energy dispatch circuit, for JSC "National Company Kazakhstan Temir Zholy," equipment supply LLP "ASPMK-519"
2009 Design, manufacturing, commissioning, and supervised installation of containerized transformer substations (CTS), LV/MV switchgear, transformer relay panels (TRP), control panels (NKU), and switchgear (KSO) for the "Uzen Substation" project LLP "ASPMK-519"
2009 Design of a digital communication system based on UMUX 1500 multiplexers for the "Kuryk Substation," "Yersay Shipyard Substation," and "Parity Ltd Substation" projects LLP "ASPMK-519"
2009 Design, manufacturing, commissioning, and supervised installation of LV/MV switchgear for the "220 kV Ridder CHP-BHPP Line" project LLP "ASPMK-519"
2009 Design, manufacturing, commissioning, and supervised installation of a 0.4 kV auxiliary power panel with UPS for the "Full Development of the 10 kV Distribution Network, LLP Yersay Caspian" project LLP "ASPMK-519"
2009 Design, manufacturing, commissioning, and supervised installation of a 0.4 kV auxiliary power panel with ATS and LV/MV switchgear for the "Modernization of Electrical Networks, JSC TATEK" project LLP "ASPMK-519"
2009 Design, manufacturing, commissioning, and supervised installation of relay protection and automation (RPA), OLTC panels, 0.4 kV auxiliary power panels, DC distribution panels, AMR systems, modular buildings, and LV/MV switchgear for the "Benkala Substation, Aktobe Region" project LLP "ASPMK-519"
2009 Construction of the "Uzen–Turkmenistan State Border" railway line: Telemechanization of power supply devices for the Uzen-Bolashak energy dispatch circuit, for JSC "National Company Kazakhstan Temir Zholy" LLP "ASPMK-519"
2009 Design, manufacturing, and supply of equipment for the "110/10/10 kV Eastern Industrial Zone Substation" project LLP "ASPMK-519"
2009 Design, manufacturing, commissioning, and supervised installation of modular buildings, equipment, and communication systems for the "Construction of the Uzen–Turkmenistan State Border Railway Line" project LLP "ASPMK-519"
2009 Supply of materials for the metro construction project LLP "Practical Electrical Engineering"
2009 Design, manufacturing, supply, commissioning, and supervised installation of LV/MV switchgear, auxiliary power panels with ATS, and relay protection panels for the "Kirov Substation" project LLP "Corporation Electra"
2009 Design, manufacturing, and supply of equipment for the "Taukent-Tortkuduk, Mynaral Field" project LLP "Schneider Electric"
2009 Design, manufacturing, and supply of equipment for the "Nura Substation" project LLP "ANM Power Engineering Group"
2009 Design, manufacturing, and supply of equipment for the "Southern Field, Mynaral, Suzak District" project LLP SP "Katko"
2009 Design, manufacturing, and supply of control panels (NKU) LLP "Spetselectra"
2009 Design, manufacturing, and supply of equipment for the "Kyzylkiya Substation" project LLP "Practical Electrical Engineering"
2009 Design, manufacturing, and supply of equipment for the "Central Substation" project JSC "Almatyelectrosetstroy"
2009 Design, manufacturing, and supply of equipment for the "43A Substation" project LLP "Electrokabel Plant"
2009 Design, manufacturing, and supply of LV switchgear for the "Mynaral Field" project LLP "Practical Electrical Engineering"
2009 Design, manufacturing, and supply of equipment for the "Zhambyl Substation" project LLP "EnergoStroyProekt"

 